feat(proposal): wrote up risks

This commit is contained in:
Anthony 2024-02-22 18:39:44 +00:00
parent bef694d5bf
commit 5dfea29d1b
2 changed files with 22 additions and 7 deletions

Binary file not shown.

View File

@ -383,13 +383,28 @@ complement the coursework to be implemented. As a result, the
prototype will enhance the poster and presentation. prototype will enhance the poster and presentation.
\subsection{Risks} \subsection{Risks}
\begin{itemize} %\begin{itemize}
\item Time management - that's why the last part of modelling is %\item Time management - that's why the last part of modelling is
done after the simulator connector as it's not essential, % done after the simulator connector as it's not essential,
can be done manually % can be done manually
\item Simulator not being good enough? %\item Simulator not being good enough?
\item Simulator could be too complex to be able to link with model. %\item Simulator could be too complex to be able to link with model.
\end{itemize} %\end{itemize}
The main risk is time management, as falling too far behind could
be detrimental. However, to prevent falling behind, certain days
will be planned to include breaks, which is included in the plan,
to prevent a burnout. Even if a burnout were to occur, there should be
enough spare time built up from the pessimistic deadlines to
prevent falling behind schedule.
There is also a small risk of the current home flight simulators not
being suitable to test the formal model, as their SDKs may not have
the tools necessary or the formal model may be too complex to connect to
the simulator. If this were to be the case, there could be other
another way to test, such as manually flying the plane in the simulator,
but recording data in the model manually, to provide feedback on the
checklist tests.